SEMA Customer: Zimmerei - Holzbau Erler GmbH
Name of project: Extension of joinery hall
Type of construction: Glue laminated truss beam on clamped supports
Location: Tux/Zillertal valley/Tyrol
Time of construction: 4 weeks (12/2021 - 01/2022)
Timber consumption: 150 m³
Characteristics: Glued-laminated truss frame with a span of 15 m and an one-sided projection of 5 m - distance between the axes 5 m. The nodes have been fabricated by means of slotted plate connections with drift and fitted bolts.
Website: www.holzbau-erler.at
Facebook: www.facebook.com/erlerholzbaugmbh
Instagram: www.instagram.com/erler.holzbau